Three hurricane swells in six weeks broke over the Long Beach Peninsula seawall. Sandbags, K-rail and a $9.75M sand plan. Our read on the season.

Long Beach, CA · September to October 2026 · Published

01 / The story

Hurricane Marie sent swell north over Labor Day weekend. On the Long Beach Peninsula it came over the seawall and tore up sections of the old wooden boardwalk. Nineteen homes along the water were evacuated. The worst of it sat between 62nd and 69th Place, where the city manager said crews could not even get trucks down to rebuild the sand berm.

Hurricane Polo followed at the end of September. The National Weather Service forecast tides near seven feet, almost a foot above normal, with four to seven foot surf, and Peninsula beaches closed. The City Council ratified City Manager Tom Modica's local emergency proclamation, and K-rail went down at the 72nd Place lot. Long Beach approved a $9.75 million sand dredging project, expected to start in late October.

Then Hurricane Rachel in early October. Marine Safety Chief Gonzalo Medina warned that water could reach the streets and the boardwalk, and crews stacked sandbags underneath it. Tides ran one to two feet above normal. Down the coast in Dana Point, beachfront homes were red-tagged and boulders were trucked in. Behind all of it, NOAA put the odds of a very strong El Niño this fall and winter at better than 90 percent.

Homes, 62nd–69th PlK-rail, 72nd Pl lotSandbags under boardwalkSand bermNormal high tidePolo forecast ≈ 7 ftMarie: swell over the seawallLabor Day weekend · then Polo, then RachelSection, schematic · not to scale
Section through the Peninsula. The hardest-hit stretch, the defenses that went in and the tide the NWS forecast for Polo.

02 / The take

The picture of the season is not the wave. It is the repair. Patches over a historic wooden boardwalk. Concrete K-rail, the barrier from every freeway on-ramp, set on a beach parking lot facing the open Pacific. Sandbags stacked under a walkway like ballast under a ship.

That is beach brutalism without anyone meaning it. A highway material, a sandbag wall and an old wooden boardwalk in one frame, and none of them were designed to meet. The city is building architecture in real time, by hand, against water that does not negotiate.

03 / The thread

We read it as structure under pressure, the same tension that runs through the Lebbeus Woods linework in our square prints: lines holding something back. And the uniform does not change. Tee, boardshorts, sand in everything, out on the wall at low tide to see what the night took.

Next: The Wedge gives up its bones. ↗